
Subway Tile En Suite
Customer had issues with shower leak in the past and basin not draining. Following installation of new heating system, airing cupboard was to be knocked through for the installation of a larger walk in shower and renovation of the rest of the en suite. Pipework rerouted from airing cupboard into stud wall. Waste all rerouted and repositioned as was found to flow uphill.














